EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BobCollins
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (575)
Empennage
- (67)
Wings
- (54)
Fuselage
- (124)
Finishing
- (69)
Canopy
- (28)
Fuel System
- (12)
Firewall
- (3)
Controls
- (13)
Landing Gear
- (30)
Lighting
- (13)
Avionics
- (80)
-
Finished GPU...
-
Made a bracket for GPU
-
Wired up White...
-
Mucking around the...
-
Avionics are alive
-
Ground power unit
-
Closed up the panel
-
Sealed wire...
-
Nutplate for fuel...
-
Prepped panel for MFD
-
Removing AMP connectors
-
Cleaning up things...
-
Discovering errors
-
Fitting panels
-
Sealing grommets
-
Installed platenuts...
-
Tidying up some wiring
-
My kingdom for a screw!
-
Installed...
-
Putting stuff back...
-
Installed GEA 24
-
Installed GTR 200...
-
One step back
-
Building supports...
-
ProSealed rivet heads
-
Finished firewall...
-
Firewall drilling
-
Prepped more G3X pieces
-
Prepped G3X brackets
-
Added instrument...
-
Moved autopilot...
-
Installed autopilot...
-
Installed autopilot...
-
Autopilot pushrods
-
Prepped top baggage...
-
Added chafing...
-
Installed ADS-B IN...
-
Reinstalled fuel...
-
It's time to put...
-
Not much of anything
-
Installing equipment...
-
Finished installing...
-
Installing bushings
-
Crimped on...
-
Connected ELT, ran...
-
ELT, Fuel pumps,...
-
Snap bushings and...
-
Two steps forward....
-
Flap motor wiring
-
Installed headphone...
-
Connections to stick...
-
Finished routing...
-
Routed wires on the...
-
GPS/XM wires routed
-
Secured fuse block...
-
Attached Generator A...
-
Connected relay wires
-
Connected G3x wires...
-
Rerouting wires
-
These instructions...
-
Connected coax to...
-
Installed autopilot...
-
Connected trim wires...
-
Routed fuel pump wires
-
Finished pilot-side...
-
Mounted AV-6000
-
Began plotting the...
-
Completed stick wiring
-
Back to work on the...
-
Expanded forward...
-
Evaluated holes that...
-
Enlarged holes
-
The curse of the...
-
Installed ELT.
-
Canopy lock sensor
-
Installed stick grips
-
Drilled hole in stick
-
Com and transponder...
-
CPU fans installed
-
Ordered avionics
Engine
- (35)
Propeller
- (14)
Interior Finish
- (2)
Paint / Decals
Inspection
Research
Workshop
- (2)
Service B's
- (29)
Builder Name:
Bob Collins
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
1055
Total Expense:
$101645.34
Start/Last Date:
Jan 04, 2017 - No Finish Date
Engine:
Rotax 912iS
Propeller:
Sensenich
Panel:
Dual screen G3X, autopilot
Friendly URL:
https://eaabuilderslog.org?s=BobCollins
Home or Last Project Picture
Jun 10, 2022
Installed autopilot disconnect
- (.5 hour)
Category: Avionics
Routed the autopilot disconnect and attached per the instructions. Also installed the ES-00195 Dimmer Potentiometer.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.